The master bathroom vanity was installed yesterday. Hooray!
Yes, you can see the brackets, but not much. I think we should just make a decision about whether they need to be minimized more or whether we can live with some projection later. From this perspective it doesn't look too bad to me.
I picked the vessel sink up this morning from our miracle-working glass cutter: he was the only one brave enough to try cutting a hole in the bottom of the antique punchbowl for a drain. (Everyone else - including several other glass cutters - was too afraid they'd shatter it.) Isn't it awesome that he succeeded? Looks perfect!
Thursday, 4 August 2011
Wednesday, 3 August 2011
Yet more installed light fixtures
More light fixtures went in in advance of the electrical inspection. Here are the chandeliers in the common entryway and in the entryway to our unit:
And here's a flush-mount star in the headhouse with its frosted cover plate:
The lantern outside the headhouse french doors. The jerry-rigged wooden box will be painted black to match the windows. (Maybe I can get the lighting company to make us a box out of the same metal as the back plate):
The chandelier in our master bedroom walk-in closet (hung too high - we'll adjust it):
The flush-mount in our master suite entryway. The glass broke during shipping so we're waiting on a replacement piece with that same frosted look as the head-house's star flush-mounts:
The pendant in the master bedroom toilet cubicle:
The giant lanterns in the upstairs hallway:
The lantern in my boyfriend's daughter's room:
The wall sconces above the vanity in the guest bathroom:
The wall sconces above the vanities in the tenants' bathrooms are in too, but I forgot to take pictures.
A couple of door hardware problems
Two problems have cropped up with our door hardware. The first is the smaller problem: it seems that the store forgot to place the order for the secondary egress doors from the tenants' units and the lock-set into the utility room, so we're short those four items. I'm looking into that with them now. Worst case, they'll put something cheap and temporary on the doors to pass the inspection and we'll get the items ordered up pronto.
The bigger problem with with the front door hardware, which was installed last week. It's really important to me that the front door look *amazing* since it's the focal point of the face of the red brick building. Hence the gorgeous old salvaged door we put in and the refinishing work we did on the transom window. Hence, too, the obscene amount of money I spent buying a (completely custom) Rocky Mountain mortise lock for that door. Apparently someone measured wrong or ordered wrong because this is what we've got:
So off-center! And cutting the door's molding to accommodate it? Really? Looking at it makes me queasy. I've been in touch with the hardware store to see what can be done. Smaller backplate? Smaller mortise? I know it might seem like a ridiculous detail but it's going to depress me every single time I enter the red brick building, so I've got to find a solution.
The bigger problem with with the front door hardware, which was installed last week. It's really important to me that the front door look *amazing* since it's the focal point of the face of the red brick building. Hence the gorgeous old salvaged door we put in and the refinishing work we did on the transom window. Hence, too, the obscene amount of money I spent buying a (completely custom) Rocky Mountain mortise lock for that door. Apparently someone measured wrong or ordered wrong because this is what we've got:
So off-center! And cutting the door's molding to accommodate it? Really? Looking at it makes me queasy. I've been in touch with the hardware store to see what can be done. Smaller backplate? Smaller mortise? I know it might seem like a ridiculous detail but it's going to depress me every single time I enter the red brick building, so I've got to find a solution.
Inspection news and first look at master bath vanity and owner's kitchen cabinetry
We are rushing, rushing, rushing to get enough of the red brick building finished to get our certificate of occupancy so that we can get a bank loan (our old one expired). To get the C of O, we need final inspections of plumbing, electrical, life safety (fire prevention), and lastly an overall building inspection. We passed our plumbing inspection late last week so that's one down. We flunked the electrical because we were missing too many fixtures and our electrician thought the wired areas would be okay temporarily without blank plates. Wrong: we needed the plates. The electrical inspector is scheduled to be back at the RBB today (the blank plates are in) and hopefully we will pass the electrical. Next up: life safety.
Meanwhile, the custom cabinetmaker sent his installers to the building yesterday to put in the master bathroom vanity and frames for the base cabinets in the owner's kitchen. They started in the kitchen and were still in the middle of that when I arrived. I took a couple of quick photos while they were having lunch. First reaction: I love them! I love the way they preserved the patina of the ceiling joists we salvaged from the RBB, which at the same time getting rid of the worst of the dirt and making them flat and splinter free. Everyone has been giving me a really hard time when I asked for that look to our wood, explaining why it was a bad idea and couldn't be done, and here our awesome cabinet guy just got on with it (after quadruple-checking with me that it's what I really wanted) and it looks even better than I'd imagined. Look at the tongue-and-groove of the planks lining the *inside* of the cabinets (click on the photo to enlarge it):
This is the inside of one of the base cabinets, another top-down shot:
The part of the counter top that dips down is where the enormous salvaged cast iron double sink is going to be. As you can see, still a work in progress, but at least it's looking awesome and at least it's moving.
They also brought the master bathroom vanity to install. It's basically just a shelf, cantilevered into the wall. Here it is, propped up in the shower:
I absolutely love detail of the mitered corners. And look at the lovely patina they preserved on the wood! We are going to have a piece of glass cut to protect the wood (and keep the dropped toothpaste out of the grain) and then our antique punch bowl will sit on the glass and serve as the sink. (Fingers crossed that cutting the hole in the base for the drain goes okay. Everyone has been too afraid to do it and risk shattering the bowl. Finally our glass cutter agreed to take on the challenge yesterday.) With regards the vanity itself, my biggest concern is that they make it "float" as much as possible, with the support brackets set invisibly high up and far back into the wall. I know it's a structural challenge for them so I'm a bit worried about the final look of the thing.
Meanwhile, the custom cabinetmaker sent his installers to the building yesterday to put in the master bathroom vanity and frames for the base cabinets in the owner's kitchen. They started in the kitchen and were still in the middle of that when I arrived. I took a couple of quick photos while they were having lunch. First reaction: I love them! I love the way they preserved the patina of the ceiling joists we salvaged from the RBB, which at the same time getting rid of the worst of the dirt and making them flat and splinter free. Everyone has been giving me a really hard time when I asked for that look to our wood, explaining why it was a bad idea and couldn't be done, and here our awesome cabinet guy just got on with it (after quadruple-checking with me that it's what I really wanted) and it looks even better than I'd imagined. Look at the tongue-and-groove of the planks lining the *inside* of the cabinets (click on the photo to enlarge it):
This is the inside of one of the base cabinets, another top-down shot:
The part of the counter top that dips down is where the enormous salvaged cast iron double sink is going to be. As you can see, still a work in progress, but at least it's looking awesome and at least it's moving.
They also brought the master bathroom vanity to install. It's basically just a shelf, cantilevered into the wall. Here it is, propped up in the shower:
I absolutely love detail of the mitered corners. And look at the lovely patina they preserved on the wood! We are going to have a piece of glass cut to protect the wood (and keep the dropped toothpaste out of the grain) and then our antique punch bowl will sit on the glass and serve as the sink. (Fingers crossed that cutting the hole in the base for the drain goes okay. Everyone has been too afraid to do it and risk shattering the bowl. Finally our glass cutter agreed to take on the challenge yesterday.) With regards the vanity itself, my biggest concern is that they make it "float" as much as possible, with the support brackets set invisibly high up and far back into the wall. I know it's a structural challenge for them so I'm a bit worried about the final look of the thing.
Thursday, 21 July 2011
A big photo update
I went in to the red brick building today armed with a camera and the determination to take LOTS of photos for the blog. The first thing I realized I haven't yet photographed is the front door, with the transom window in place and the coat of primer on: (Notice that our ironworker also installed the post from which the gas lantern is going to hang.)
Immediately inside the front door is the new flooring in the common entryway:
And in the entryway to our unit:
Here's the range hood I mentioned that they'd installed in Unit 1's kitchen:
And the roof garden railings (they're high because of the foot of soil that's going across the roof's entire surface):
One of our staircases' finials is on:
The guest bathroom vanity's marble top now has holes cut in it for the undermount sink and faucet:
The guest bathroom's floor tile has been grouted:
And so has the hearth tile:
There are also new light fixtures installed in the kitchen:
And on the staircase between our entryway and the living room level (don't think I like 'em though):
And in the headhouse:
When I left the RBB, there was a plumber working in the master bathroom (more problems cropping up with the shower), one of the carpenters was gluing up the extra plaster rosettes I picked up on Tuesday and another carpenter was working on the staircase balcony railing in our dining room (which is the last of the staircase railings that needs to be installed). Slowly, slowly, bit by bit the project continues to come together.
Immediately inside the front door is the new flooring in the common entryway:
And in the entryway to our unit:
Here's the range hood I mentioned that they'd installed in Unit 1's kitchen:
And the roof garden railings (they're high because of the foot of soil that's going across the roof's entire surface):
One of our staircases' finials is on:
The guest bathroom vanity's marble top now has holes cut in it for the undermount sink and faucet:
The guest bathroom's floor tile has been grouted:
And so has the hearth tile:
There are also new light fixtures installed in the kitchen:
And on the staircase between our entryway and the living room level (don't think I like 'em though):
And in the headhouse:
When I left the RBB, there was a plumber working in the master bathroom (more problems cropping up with the shower), one of the carpenters was gluing up the extra plaster rosettes I picked up on Tuesday and another carpenter was working on the staircase balcony railing in our dining room (which is the last of the staircase railings that needs to be installed). Slowly, slowly, bit by bit the project continues to come together.
Tuesday, 19 July 2011
More progress on our unit's staircases and tile angst
The balcony railing in the headhouse:
And the balcony railing on the third floor (bedroom level):
They were working on the staircase between the second and third floors when I left them this morning so maybe they'll be done by the end of the week. It'll be great to see what it looks like painted and with the finials on top of the newel posts.
In less visually pleasing but still great news, one of the crew put in the drywall around the basement utility room, so they should be able to add the fire-rated steel door that seals off that space shortly.
Our GC and his crew had also installed the range hood in one of the tenant's units and was were working on the hood in the second tenant's unit.
Lastly, I forgot to take photos, but the tile guy came this morning and grouted the floor in our guest bathroom. It looks phenomenal! On the drive in to the red brick building my fiance and I revisited the age old question of which wall tile we should use in that bathroom. I had found something I liked even better than any of the options from my last post about tile (here). It also happens to be slightly cheaper than they were, but still not cheap by a long stretch. It's by a manufacturer in upstate New York called Quemere and is similar in style to the first three tiles in my last post. Unfortunately the cost was getting close to $5000 for enough to do the bathtub alcove. It feels a bit ridiculous to spend that much, especially on a guest bathroom that isn't going to see a heck of a lot of use. I called up the no-frills place where I bought the white hex that's on the floor and got prices for plain ceramic 3x6, 4x4 and 6x6. They're all about 1/10th of the cost of the fancy handmade tile, depending on which size I were to choose. I'm leaning towards just getting something inexpensive and counting on all the other aspects of the bathroom - the antique marble-topped vanity, the huge old mirror, the gold fixtures, the arch over the tub - to carry the day. I do want to check that the whites are okay together, though, since they're from different manufacturers. Is this giving up or being sensible? Sometimes on this project it's hard to tell.
And the balcony railing on the third floor (bedroom level):
They were working on the staircase between the second and third floors when I left them this morning so maybe they'll be done by the end of the week. It'll be great to see what it looks like painted and with the finials on top of the newel posts.
In less visually pleasing but still great news, one of the crew put in the drywall around the basement utility room, so they should be able to add the fire-rated steel door that seals off that space shortly.
Our GC and his crew had also installed the range hood in one of the tenant's units and was were working on the hood in the second tenant's unit.
Lastly, I forgot to take photos, but the tile guy came this morning and grouted the floor in our guest bathroom. It looks phenomenal! On the drive in to the red brick building my fiance and I revisited the age old question of which wall tile we should use in that bathroom. I had found something I liked even better than any of the options from my last post about tile (here). It also happens to be slightly cheaper than they were, but still not cheap by a long stretch. It's by a manufacturer in upstate New York called Quemere and is similar in style to the first three tiles in my last post. Unfortunately the cost was getting close to $5000 for enough to do the bathtub alcove. It feels a bit ridiculous to spend that much, especially on a guest bathroom that isn't going to see a heck of a lot of use. I called up the no-frills place where I bought the white hex that's on the floor and got prices for plain ceramic 3x6, 4x4 and 6x6. They're all about 1/10th of the cost of the fancy handmade tile, depending on which size I were to choose. I'm leaning towards just getting something inexpensive and counting on all the other aspects of the bathroom - the antique marble-topped vanity, the huge old mirror, the gold fixtures, the arch over the tub - to carry the day. I do want to check that the whites are okay together, though, since they're from different manufacturers. Is this giving up or being sensible? Sometimes on this project it's hard to tell.
Saturday, 16 July 2011
First photo of one of our unit's staircases
Our contractor emailed us this photo this afternoon:
It's the staircase between the third floor and the headhouse. (No finial yet on the newel post.) Despite enjoying the gorgeous weather this weekend, now I can't wait to go in to the red brick building on Monday!
It's the staircase between the third floor and the headhouse. (No finial yet on the newel post.) Despite enjoying the gorgeous weather this weekend, now I can't wait to go in to the red brick building on Monday!