Tuesday 8 March 2011

The heat is on! Plus, Unit 2 kitchen cabinet framing

When I visited the red brick building this morning, I could smell something burning and it felt a bit warm when I walked in the front door.  No, our money pit had not caught on fire.  Rather, the HVAC guys had sodered some copper pipe and the heat was finally working!  Two members of the GC's crew were upstairs installing the door to the fire escape.  I should have a photo of that very soon.

In the meantime, here are a couple of photos of the recently-built framing for the kitchen peninsula in Unit 2.  The backs of the kitchen cabinets (lowers only) will be attached to the metal frames.

1 comment:

  1. Hey there and thanks so much for stopping by La Lamp Shade!

    Best,

    Raina
    If the Lamp Shade Fits

    ReplyDelete